Current show


Publicité Publicité

$ 157 million for the Outaouais road network

$ 157 million for the Outaouais road network

6 March 2018 à 12:00 am

Transportation Minister and MNA for Pontiac, André Fortin, has announced funding of over $ 157,576,000 million for the Outaouais highway network for 2018-2020. Among the infrastructure projects, there is a significant investments in Ile-du-Grand-Calumet with the asphalting of the rue Ottawa, from Highway 148 to the montée Monseigneur-Martel. André Fortin talks about the details for the Pontiac:

Another road project has been added for the Pontiac, Rue Front in Campbell’s Bay, scheduled for 2020.

The complete interview in French with André Fortin is available here.

PROGRAMMING ROAD WORKS 2018-2020
Fort-Coulonge
Traffic Management Securing Ties for All Terrain Vehicles (ATV’s) at 5 locations (Fort-Coulonge, Grand-Remous, Clarendon, Lac-Sainte-Marie, Namur)

Île-du-Grand-Calumet
Asphalting Asphalting of the Ottawa Road, from Route 148 to the montée Monseigneur-Martel. – 2018 $$

Mansfield-et-Pontefract
Maintenance or maintenance work Repairing bridges, various locations – 2019 $
Bridge Reconstruction Felix-Gabriel-Marchand Bridge Reconstruction on Road – 2018 $$$

Otter Lake
Asphalting of Highway 301, between Highway 366 and chemin Stephens – 2019 $$

Pontiac
Asphalting of chemin Lac-des-Loups from chemin de la Swamp to chemin Henderson – 2018 $$
Reconstruction of Highway 148 from chemin Terry Fox to chemin Maple – 2018 $$

Legend
$ – Less than 1 million Dollars
$$ – Between 1 and 5 million Dollars
$$$ – Between 5 to 10 million Dollars